Thursday, December 18, 2008

SOME PROGRESS


Taps fitted but tiling above mirror still to be done and power point still missing



Glass shelves finally in now for the lighting

Top grade grouting! I don't think! And this was how it was presented at final walk through

Now we have a hole in Spa hob Why?

Bidet installed but notice holes in tiles! Yet more rework!

Bidet installed

Mortar does not match will need redoing!
CM & SS both rang today confident that despite all the problems that house will be ready for settlement come Friday! We are not so confident, Aam visited site this evening and found that yes the Bidet has arrived and been installed but not very satisfactory also mortar around spa pipes does not match, feature wall in en suite has been repainted but not with the suede effect as previously so will need re painting. Driveway still not done! Still if everything is ship shape and Bristol fashion on Friday we will be happy to settle. Lets wait and see. Hmmmmmmmmmmmm

No comments: