Niche over spa bath

Niche in en suite shower

Hole in bedroom wall (note plumbing for shower)

This is the shower on the other side of the hole above

Outside lights fitted

A visit to site tonight revealed that driveway has not been poured as promised which means that even if it is poured tomorrow then walk through on Wednesday is in doubt because it is likely that concrete will not have set sufficiently to support my motorised wheelchair (98kgs + me 78kgs) In addition to this much still appears to be done, Tap ware in en suite, Bidet, Hot water system, water tank. Also a large hole has been made in feature wall in main bedroom we do not know why this has been done but I am assuming it has something to do with the shower plumbing on the other side of the wall. The sparkies were on site today installing more light fittings and security system.