Stack stone detail
Feature Stack stone being installed at entrance
Clipsol "Saturn" dimmer
Clipsol "Saturn" Double gang switch
Not only had the tiler started back at work on site since last week but also the electrician had also started to install switchgear (we have opted for the Clipsol "Saturn" range except in those areas which are hidden from view where we have stuck with the standard range) We are expecting that he will have all the light switches and light fittings installed by the end of the week.
The first thing that we noticed when we arrived today was that they had commenced the installation of the feature Stack stone around the front door.
2 comments:
Oh wow ! The entrance looks awesome ! Gorgeous stackstone !
Thanks Gong we like it!